An existing DMG client requested us to work with their designer to update their spa facilities at their private members club in London. The project was to convert a shower room into a state-of-the art aqua meditation and relaxation room and an existing plunge pool into a steam room.
To meet the designer’s brief for the relaxation room, we fitted bespoke German prefabricated heated walls and heated, light changing floors. The very individual nature of this contract meant that a luxury bespoke seating area was also required, surrounding a central feature of light changing glass columns.
To convert the old plunge pool into a steam room, we built up the original sunken floor and extended the original area, taking care to seamlessly match the existing mosaic tiling throughout. A new steam generator and bespoke seating were also installed to complete the steam room.
The project was successfully completed within tight timescales. The club remained open throughout the project, ensuring minimum disruption to club members.